At a glance
HVAC, electrical, plumbing, cold systems and building fabric: an effective multitechnical plan connects assets, priorities, teams, SLAs, CMMS and budget.
Multitechnical maintenance is a system, not a list of trades
Putting HVAC, electrical, plumbing, cold systems and building fabric under one contract does not automatically create effective multitechnical maintenance. Value comes from coordination: one asset view, shared priorities, one request channel, escalation rules and consolidated reporting.
1. Define the technical scope
Map the equipment included and excluded from the contract: HVAC, electrical systems within scope, plumbing and pumping, cold equipment, minor building works and other identified assets. Specialist installations requiring separate qualifications or contracts should be managed as explicit interfaces.
2. Build an asset hierarchy
Structure data from site to zone, system and individual asset. This supports CMMS, reporting and multi-site comparison.
3. Assess criticality
Rank assets by business impact, safety, comfort, downtime cost, recovery time and backup capacity. Critical assets receive stronger inspection, documentation and escalation arrangements.
4. Separate preventive, corrective and improvement work
Preventive activities are planned to reduce failure risk. Corrective work responds to faults. Improvement work removes recurring causes or increases reliability. Separating them improves budgeting and decision-making.
5. Define service levels
Use priority levels instead of one response promise for every request. Define response, escalation and follow-up rules. Vigilus operates 24/7 and has an intervention framework capable of deployment within 30 minutes across Dakar.
6. Define operational roles
A robust model connects technicians and senior technicians, engineers, supervisors, controllers, a dedicated Facility Manager, technical and operations directors, and HSE support. Vigilus mobilises more than 50 technicians, senior technicians and engineers within its broader FM organisation.
7. Connect the plan to CMMS
CMMS centralises assets, requests, work orders, history and due dates. Data quality comes first: consistent naming, identified assets, clear statuses and disciplined work-order closure.
8. Build decision-oriented reporting
- preventive completion;
- corrective volume by trade;
- repeat failures;
- response-time performance;
- open backlog;
- critical-asset availability;
- cost by site or asset family where available;
- technical and HSE risks requiring decisions.
9. Structure the budget
Separate predictable recurring maintenance, routine parts, unplanned corrective costs and major replacements. Historical data progressively improves forecasting.
10. Review the plan
New equipment, occupancy changes, repeated failures and building modifications should change priorities. The maintenance plan must evolve with the site.
Why connect maintenance to Facility Management?
Within integrated Facility Management, technical maintenance shares governance with cleaning, guarding, reception, green spaces and general services. The client gets a dedicated Facility Manager, one point of contact and consolidated reporting.
Request a multitechnical maintenance assessment for a site in Dakar or a multi-site network in Senegal.