At a glance
Industrial FM must start from asset criticality, intervention windows, HSE and operational continuity.
Industrial FM must understand production
Poorly planned work can cost more than the failure it was meant to prevent. FM must start from assets, operating windows, HSE and production constraints.
1. Build asset criticality
Rank assets by production, safety, environmental impact and redundancy.
2. Separate preventive, corrective and improvement work
These work types solve different problems and should remain visible in reporting.
3. Plan around operating windows
Shutdown work requires preparation of people, tools, parts and permits before the intervention window.
4. Integrate HSE
Risk analysis, isolation, permits and PPE should be built into the workflow where required.
5. Use CMMS as technical memory
History reveals repeat failures, expensive assets and overdue preventive work.
6. Coordinate industrial cleaning and maintenance
Cleaning plans should respect site zones, operating processes and safety requirements.
7. Use real supervision
Vigilus combines 50+ technicians, senior technicians and engineers with supervisors, controllers, Technical and Operations management and HSE support.
8. Report for decisions
Highlight critical assets, preventive completion, repeat failures, backlog and investment risks.