Advice / Practical guide Multi-technical Maintenance

Industrial Facility Management in Senegal: reduce disruption without disorganising production

Industrial FM must start from asset criticality, intervention windows, HSE and operational continuity.

17 August 2026 1 min read
Industrial Facility Management in Senegal: reduce disruption without disorganising production
Vigilus Facilities

At a glance

Industrial FM must start from asset criticality, intervention windows, HSE and operational continuity.

Industrial FM must understand production

Poorly planned work can cost more than the failure it was meant to prevent. FM must start from assets, operating windows, HSE and production constraints.

1. Build asset criticality

Rank assets by production, safety, environmental impact and redundancy.

2. Separate preventive, corrective and improvement work

These work types solve different problems and should remain visible in reporting.

3. Plan around operating windows

Shutdown work requires preparation of people, tools, parts and permits before the intervention window.

4. Integrate HSE

Risk analysis, isolation, permits and PPE should be built into the workflow where required.

5. Use CMMS as technical memory

History reveals repeat failures, expensive assets and overdue preventive work.

6. Coordinate industrial cleaning and maintenance

Cleaning plans should respect site zones, operating processes and safety requirements.

7. Use real supervision

Vigilus combines 50+ technicians, senior technicians and engineers with supervisors, controllers, Technical and Operations management and HSE support.

8. Report for decisions

Highlight critical assets, preventive completion, repeat failures, backlog and investment risks.